The Town of Kitty Hawk has completed it’s beach nourishment project
Post Construction Information
Kitty Hawk-FEMA 2020 Maintenance plan Update February 2021
Three Year Beach Monitoring Report January 2021
Click here to view the Beach Nourishment Completion Report
Click here to view the Post Construction and Monitoring Survey Report
(Very large document)
Additional Appendix documents:
- Appendix A – As-built Plan Views:
- Appendix B – Post Construction (December 2017) Survey Report
- Field Book Pages
- Dare County Monument and Station Information
- Additional Photos and Final 2017 Post Construction Survey are available by request.
- Appendix C – As-Built BA Drawings:
- Appendix D – Pre- and Post-Construction Borrow Area Survey Data
- Post Construction Survey
- Pre- Construction Survey
- Appendix E – APTIM Daily Observation Reports
- Available upon request
- Appendix F – GLDD Daily Quality Control Reports
- Available upon request
- Appendix G – Sea Turtle Capture and Relocation Froms and Incidental
- Appendix H – Change Orders
- Appendix I – Construction Plans – Final
- Appendix J – Field Adjustment Reports
- Appendix K – Requests For Information
- Appendix L – Sediment Granularmetric Reports
- Appendix M – Pay Applications
- Appendix N – Survey Data
- Pre-Construction Surveys
- Available upon request
- Post Construction Surveys
- Available upon request
- As-Built Surveys
- Available upon request
- Static Vegetation Line
- Pre-Construction Surveys
- Photos
- Available upon request